logo
Shandong Jingwei Steel Manufacturing Co., Ltd.
E-mail admin@sdjws.com TEL: 86-13501001767
Rumah > Produk > Pipa Baja Tabung Baja >
Alloy Steel Seamless Pipe ASTM A335 P11 P22 OD 168.3mm Sch80 12m Length for Power Plant
  • Alloy Steel Seamless Pipe ASTM A335 P11 P22 OD 168.3mm Sch80 12m Length for Power Plant
  • Alloy Steel Seamless Pipe ASTM A335 P11 P22 OD 168.3mm Sch80 12m Length for Power Plant

Alloy Steel Seamless Pipe ASTM A335 P11 P22 OD 168.3mm Sch80 12m Length for Power Plant

Tempat asal CINA
Nama merek Jingwei
Sertifikasi ISO 9001:2015, ASTM A335 P11 / P22, EN 10204 3.1
Nomor model JW-ALY-A335
Rincian produk
Nilai:
P11 (1,25Cr-0,5Mo), P22 (2,25Cr-1Mo)
OD x WT:
168,3 mm x 10,97 mm (Sch80)
PERAWATAN PANAS:
Diatur dan Diatur
Menyoroti: 

ASTM A335 P11 pipe

,

P22 alloy steel pipe

,

168.3mm Sch80 alloy pipe

Syarat Pembayaran & Pengiriman
Kuantitas min Order
5 Ton
Harga
USD 1150 - 1480 per ton FOB Tianjin
Kemasan rincian
Dibundel, diikat, ujungnya ditutup, nomor panas distensil
Waktu pengiriman
20 - 30 hari setelah setoran
Syarat-syarat pembayaran
T/T deposit 30%, saldo terhadap salinan B/L; L/C pada pandangan
Menyediakan kemampuan
1200 Ton per Bulan
Deskripsi Produk
Chrome moly pipe is specified for one reason: carbon steel loses creep strength above about 425 degrees C and P11 or P22 does not. P11 carries 1.25 percent chromium with 0.5 percent molybdenum and holds useful strength to roughly 540 degrees C, while P22 with 2.25 percent chromium and 1 percent molybdenum extends that to about 590 degrees C. This pipe is supplied at 168.3 mm outside diameter, Sch80, 12 m length, normalized and tempered, and certified to ASTM A335. The

Hubungi kami kapan saja

86-13501001767
Taman Industri Distrik Dongchangfu, Kota Liaocheng, Provinsi Shandong, Cina
Kirim pertanyaan Anda langsung ke kami